CALGARY, May 30, 2019 /PRNewswire/ – Enbridge Inc. (TSX: ENB) (NYSE: ENB) (Enbridge or the Company) today addressed statements made yesterday by the Michigan Attorney General and Governor about our joint efforts with the State on the proposed construction of an underground tunnel that would ultimately house a replacement of the existing Line 5 pipelines across the Straits of Mackinac, which have always operated safely. In recent meetings and in a letter to the Governor, Enbridge has reiterated its shared vision with Michigan of further reducing risk and how we believe constructing a tunnel to house the Straits pipelines is the most effective and timely way to remove the existing Line 5 while ensuring the critical energy needs of Michiganders are met. Enbridge has committed to construct the tunnel as quickly as prudently possible and to advance a number of additional protective measures while we construct the tunnel.  Given the Attorney General’s opinion that the previous administration tunnel authority is invalid, Enbridge engaged and has continued to engage the State about alternatives to address that concern. Discussions with the State along with additional commitm...